Yulong Petrochemical
- The total operating time reaches 144 hours under normal operating conditions.
- At least 72 hours of warehousing peak test is included.
- The equipment failure rate is 5 %d the system error rate is 5 %.
- The project includes WMS system, intelligent warehouse control system, intelligent warehouse dispatching system, etc.